Swiss Turned Parts Checklist: Design & Tolerance Items

Swiss Turned Parts Checklist: Design & Tolerance Items — A design-first checklist for Swiss turned parts — the wall thickness, tolerance and feature items that make a quote. Tolerances: ±0.002 mm turning, ±0.003 mm milling — ISO 9001 / IATF 16949 verified.

A design-first checklist for Swiss turned parts — the wall thickness, tolerance and feature items that make a quote accurate, and the drawing details you should settle before the first article.

In brief
  • Dongguan Zhuohang Ltd (Registration No. 91441900MA4UWT6X39), operating as Zhuohang Precision Machining Factory, established 2005.
  • more than 100 machines including 20+ 5-axis centres; 100+ staff, 80%+ skilled technicians.
  • A quote is only as good as the drawing behind it.
  • The four omissions that turn an accurate quote into a revised one.
  • Confirm revision, FAIR scope, and delivery terms in writing before release.

What to include with a swiss machining drawing

A quote is only as good as the drawing behind it. The gap between a fast quote and an accurate one is almost always a missing tolerance scheme, an unspecified surface finish, or a material callout that names a family rather than a grade.

The five things that change the answer: the 3D model, the 2D drawing with tolerances, the material grade, the quantity (and the anticipated repeat quantity), and any inspection or certification requirement.

Pre-release verification

Before releasing, these are the items worth confirming in writing.

  • Which drawing revision is being built — in writing, on the order acknowledgement.
  • What the first-article report will contain, and whether it is full inspection or a sample plan.
  • How capability is reported, the index, the stage, and the sigma estimator, named.
  • Who owns an engineering change and how it is documented mid-run.
  • Packaging, duty, and freight responsibility — whether the quote is EXW, FOB, or delivered.

What design decisions move the cost on swiss machining?

Three design decisions drive most of the cost on a machined part: internal corner radii matched to a real cutter diameter, cavity depth kept within about four times the tool diameter, and a general tolerance on every feature that does not mate. Each one changes the tool that can be used, and the tool determines how much material can be removed per minute. Which is why these matter more than any process selection.

This is worth raising at quote stage rather than after the first article, because the changes are usually trivial on the drawing and significant on the machine.

What tolerance applies?

STAR SR-32JM Type N Swiss-type CNC automatic lathe at Zhuohang Precision Machining Factory, Dongguan, China.

±0.003 mm on CNC milling, ±0.002 mm on CNC turning; ±0.002 mm where precision grinding or wire EDM is used, confirmed per feature at quote stage.

Which legal entity is actually responsible for the work?

The registered entity is Dongguan Zhuohang Ltd, China Social Credit Code 91441900MA4UWT6X39, established 2005, also known as Zhuohang Precision Machining Factory. Registered and production address: No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470.

You can verify a Chinese manufacturer through the National Enterprise Credit Information Publicity System with that 18-character code. A trading company can also produce a business licence, but it shows a trading scope rather than manufacturing, and an office address rather than a plant.

Pre-enquiry checklist

These are the items whose absence most often produces a quote that changes after review.

  • 3D model in STEP or IGES, plus a 2D drawing — the drawing carries the tolerances the model does not.
  • Material as a grade, not a family — "stainless" is not a specification; 316L is.
  • Tolerance per feature, not a blanket note. A single tight dimension drives cost more than ten loose ones.
  • Surface finish callouts where they matter, with the standard named (Ra in ISO or ASME).
  • Quantity and expected repeat quantity — these are different numbers and they change the process.

How much of the floor is in this family?

Total machine count is not the question — the question is how many machines sit in the family that makes your part, because that is the queue your part waits in. The floor runs a hundred-odd machines: 50+ three-axis centres for prismatic work, 20+ four-axis, 20+ five-axis, 25+ turning and mill-turn centres, Swiss-type lathes for long slender parts, precision grinding and wire EDM for the tightest features.

Depth in the same family is what lets a part re-route rather than queue when a machine is pulled for service. That, not the headline machine, is what protects a delivery date.

What is the certification position?

ISO 9001:2015, IATF 16949:2016 (excluding clause 8.3 product design), and ISO 14001:2015 — each with a certificate number verifiable with the registrar.

What this shop actually runs

Ask for capability evidence and the answer should be specific. The facility behind this guide runs 100+ CNC machines on a 6,800 m2 floor in Dongguan, China, with 100+ staff. The machine list, by category:

  • 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Set up for compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
  • 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Set up for prismatic parts, plates, brackets, housings.
  • Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Set up for long, slender rotational parts at ±0.002 mm.
  • CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Set up for shafts, bushings, flanges up to ±0.002 mm.
  • Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Set up for hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
  • Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
  • Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.

Tolerances held: milling ±0.003 mm, turning ±0.002 mm, grinding and wire EDM ±0.002 mm. Capability: Ppk >= 1.67 initial and Cpk >= 1.33 in production on key characteristics.

Certifications: ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En, clause 8.3 design excluded, disclosed openly) and ISO 14001:2015 (116024/B/0001/UK/En), issued to Dongguan Zhuohang Ltd, USCC 91441900MA4UWT6X39, established 2005.

Service area: Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa — built in China, shipped worldwide.

Contact: Felipe Iglesias, [email protected], +86 13126536955.

Not sure this is the right process?

Send the model and the drawing and get a straight answer on whether this route is the right one, including where a design change would cut cost. Reach Felipe Iglesias at [email protected] or +86 13126536955.

Frequently Asked Questions

Do you need both a model and a drawing?

Yes, in practice. The model defines geometry; the drawing defines what has to be true about that geometry. A quote from a model alone leaves the tolerance scheme to assumption, which is where disputes start.

How is an engineering change handled mid-production?

The change is documented against a revision, the affected parts in process are identified, and the revised drawing is confirmed in writing before work restarts. The important part is that the revision in force at any moment is a single, written one.

What is a first-article inspection report?

A documented dimensional report on the first part off the process — typically per AIAG PPAP or a customer-defined format. It is the evidence that the process makes the drawing, and it is worth specifying before the order rather than after.

How is material traceability maintained?

Incoming stock is checked against the mill certificate — composition by XRF, hardness where specified — and traceability is held per heat or per batch as the certificate defines it.

Are you a manufacturer or a trading company?

A manufacturer. The legal entity is Dongguan Zhuohang Ltd (Registration No. 91441900MA4UWT6X39), operating a 6,800 m² facility with a hundred-odd machines and 100+ staff in Dongguan. Factory visits are welcome.

What materials do you machine?

Aluminum, stainless steel, titanium, brass, copper, and Inconel for metals; PEEK and Delrin (POM) for plastics. Material certificates are verified on incoming stock.

What files do you need for a quote?

In short, A 3D model (STEP or IGES) with a 2D drawing carrying the tolerances, surface finish callouts, material spec and any inspection or certification requirements. The drawing defines the contract — the model alone usually leaves the tolerance scheme unspecified.

Standards referenced on this page

  • ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
  • ASTM A484/A484M-24 — Standard Specification for General Requirements for Stainless Steel Bars, Billets, and Forgings
  • ISO 9001 — Quality management systems — Requirements